Harwich and Dovercourt High School: Sports Hall RAAC Remediation
S2e was appointed to deliver a full remediation of Reinforced Autoclaved Aerated Concrete (RAAC) planks identified within the roof structure of the sports hall block at Harwich and Dovercourt High School.
Following identification of the RAAC panels as part of the school's ongoing estate safety surveys, S2e led the design and delivery of a comprehensive roof replacement, removing the risk posed by the failing structure while using the works as an opportunity to modernise the building's services and internal finishes.
As part of the works, the space has been reconfigured to provide the school with a newly refurbished dance studio.
Project statistics
Client / Trust: Sigma Trust
Contractor: Brooks and Wood Ltd.
Budget: £700k
Timescale: April 2025 to Sept 2025
Funding: RAAC Remediation Scheme
Services: Building Surveying, CA/Project Management, Mechanical Engineering, Electrical Engineering, Structural Engineering, Quantity Surveying, Principal Designer
The Challenge
RAAC is a lightweight, aerated structured concrete used extensively in flat and low-pitch roof construction between the 1950s and 1990s, and is now recognised as having a limited and often unpredictable structural lifespan.
Its presence within the sports hall roof required the panels to be removed and replaced in full, rather than repaired, triggering a significant package of associated works to ceilings, building services, and roof coverings that all needed to be carefully sequenced to keep disruption to the school's timetable to a minimum.
Scope
Demolition works to remove the existing roof structure
Supply and installation of a new profiled metal deck roof structure to replace the failing RAAC planks
Supply and installation of a new felt roof system
Electrical upgrades, including new LED lighting throughout the sports hall
Upgrade of mechanical ventilation and heating systems to provide compliant natural ventilation to the sports hall
Upgrade and replacement of fire protection measures between the head of internal walls and the new roof structure to reinstate compartmentation lines
The Outcome
The completed works have removed the RAAC-related structural risk from the sports hall block entirely, replacing it with a fully compliant, modern roof system to current thermal performance standards. Alongside the roof replacement, the refreshed lighting, ventilation, and fire compartmentation have brought the building's services up to current standards. The project has also delivered a wider benefit to the school: part of the refurbished space now provides a newly fitted-out dance studio, giving the school an additional dedicated facility it didn't have before the works began.
Contact Us
If you would like to discuss how S2e can support your school with RAAC remediation, roof replacement or wider estate improvements, our team would be pleased to talk. You can contact us by phone on 0116 507 0130 or by email at enquire@s2e.org.uk.